ICU Ticket Life cycle
(See Submitting ICU Bugs and Feature Requests for general information about the ICU JIRA issue tracker.)
ICU tickets follow a definite path through their life, from initially being opened, through implementation or fixes, to closing and release of the changes in an updated version of ICU.
Ticket Types
Bugs: These are opened to report some problem with ICU library code.
A good bug report should include enough information to allow the problem to be reproduced, including (as appropriate)
the version of ICU
the Operating system type and version
the compiler version
for Java code, the JDK version
a code snippet that exhibits the problem, preferably small and self-contained
Some old tickets have Type=Bug but are bug reports on API docs, tools issues, etc. These predate the more specific ticket types.
Enhancements: These are opened to report areas where ICU can be improved but where there is not necessarily a defect. Examples: performance improvement; sanitizer patches; build system changes.
New Features: These are opened to request the addition of new functions or features to ICU.
Note: Some old tickets have an "RFE:" summary prefix (Request for Enhancement), but since we switched to better issue trackers with Type fields we no longer use such prefixes.
Most tickets with this type will require an API proposal.
Tasks: These represent work items to be done in support of the ICU project that aren't directly visible to users of the library.
Tests: For bugs or enhancements in test code that do not affect library code.
API Docs, User Guide, ...: For non-code issues.
Ticket Component
We set a component for the part of ICU that has a bug or could be improved. We use this for filtering/prioritizing/scheduling. See the ICU Components page on Jira.
Submission
Tickets may be submitted by anyone, at any time. Before submitting a bug report, it is good practice to check whether the problem has already been reported.
Incoming Tickets
The ICU team reviews new tickets roughly once a week. (Sometimes new tickets come in faster than we can handle.)
We discuss each ticket and either assign it to a team member or close it as duplicate, out of scope, etc.
Even team members should assign/accept tickets only after discussion in our team meeting. If something is urgent, send an email to the team mailing list with the ticket link and a brief explanation and note that you are grabbing the ticket.
We usually schedule tickets for an upcoming ICU release, but we have been more eager with accepting and scheduling tickets than we have been able to handle. Unfortunately, neither an upcoming "Fix Release" nor a high priority is a guarantee that a ticket will actually be fixed then. The only guarantee is Status=Done, after the fact.
Prioritization is primarily based on the requirements of the companies providing the developers to the project, and/or based on the priorities of the team members.
In order to move a ticket out of Status=New, it needs to have the following fields set:
component
fix version (can be "future" to leave it unscheduled)
assignee
priority≠assess
Once these are set, and after team agreement or email notice, team members can click "Accept".
Design
If we are not sure about the right approach for something, we put the ticket into Status=Design. The owner should come up with a plan that the team agrees with before moving to Accept or maybe closing the ticket as infeasible etc.
Development and Review
At the time actual work begins, the developer should accept the ticket, and set the Fix Version field to the upcoming ICU release (if it is not set already).
For code changes: See the git for ICU Developers page. After one or more pull requests are approved and merged, an ICU team member (the ticket owner if they are one) closes the ticket as Done/Fixed.
For non-code changes: Update the User Guide text, do your task, etc., then add a comment to that effect, set a ticket reviewer, and put the ticket into Status=Reviewing. The reviewer may ask you to do more via Status=ReviewFeedback, or they may close it as Fixed if they are satisfied.
Obsolete: svn branch development
For non-trivial commits (If in doubt, it's non-trivial), it's best to do feature work on a branch. See "Merging-and-Branching" for some tips on branch work. Here are some examples of why you would do work on a branch:
You expect contention: It's a large involved change, over a period of time, and other developers may commit code that conflicts with yours.
You are looking for review and/or testing during the development process: Others can pick up the branch and try it, or view the commits.
You expect test breakage during the development process. Commits to the trunk should not break tests. Work on a branch until the tests are clean.
All commits of code back to subversion must include the associated ticket number with the commit message. This information will be used by reviewers to identify the complete list of changes associated with a particular ticket.
svn commit messages have the form
ticket:1234: a short message describing the changes being checked in
Fixed by Other Changes
If a ticket - defect or feature - is handled by changes associated with a different ticket, a brief explanation of the situation should be added to each ticket involved, and all tickets except for the one where the real work happened should go to Status=Review; or go directly to Done/Fixed if the connection is obvious.
We do not want to lose track of the fact that a reported problem was fixed simply because it was one of a group of related problems that were fixed by a single set of code changes.
Testing
For defects, before making any fixes to the implementation code, a test should be written that fails because of the problem. The problem should then be fixed, the fix being checked by the just-written test.
C and Java
Most ICU services exist in both C and Java. Any defect reported against one side should be checked (the test ported) to the other, and if it exists, it must there as well. This must be done before moving to the review step.
Maintenance Releases
Certain high-impact tickets may be added to maintenance branches. To propose that a commit be added to the maintenance branch, cherry-pick your commits to the maintenance branch and create a pull request against the maintenance branch. For more details, see gitdev.
Mostly Obsolete:
For merging changes from the Unicode master to a Unicode maintenance branch, use a maintenance ticket such as ICU-20049 and use pull requests with cherry-pick commits from theUnicode master. For the ticket Fix Version use the next maintenance number (62.2 after 62.1) regardless of whether we actually plan for a release.
TODO: Add instructions for how to make a cherry-pick commit.
TODO: Review this section for the GitHub era. This seems like the wrong page for this contents. Merge into BRS/Publish#Tag related svn files and/or Source Code Access and/or git for ICU Developers?
For each release we create a maintenance branch, typically before we publish a release candidate. Example: http://bugs.icu-project.org/trac/log/branches/maint/maint-60
The trunk and maintenance branch may diverge some before the initial release. Changes that are agreed for the release candidate are cherry-picked by the release manager into the maintenance branch.
When we publish a release candidate, we create a tag from the maintenance branch. Example: http://bugs.icu-project.org/trac/log/tags/release-60-rc
The release manager may commit further cherry-pick changesets from the trunk to the maintenance branch.
The initial release is another tag off of the maintenance branch. Example: ICU 60.1 http://bugs.icu-project.org/trac/log/tags/release-60-1
When we have bugs that should go into a maintenance branch or release, we set the next milestone (e.g., 61m1) and add the keyword "maint". The bug fix changeset is committed to the trunk using the bug fix ticket number.
When we decide to apply a bug fix to a maintenance branch:
For a maintenance branch or release for the most recent ICU version, say, 60.2:If there is no 60.2 milestone yet, then add it to the roadmap and create a 60.2 release ticket.The 60.2 release manager commits the bug fix cherry-pick changeset to the maintenance branch.Then change the bug ticket to milestone 60.2.Note: As a result, tickets for ICU 61 show what changed since the last ICU 60.x maintenance release, corresponding to what users see who stay up to date with the latest official releases.
For a maintenance branch or release for an earlier ICU version, say, 58.3:If there is no 58.3 milestone yet, then add it to the roadmap and create a 58.3 release ticket.Use 58.3 even if we do not plan to actually publish a 58.3 release.Do not call the milestone "58.x". Use the next available maintenance release minor version number.
The 58.3 release manager commits the bug fix cherry-pick changeset to the maintenance branch.Then add the keyword "maint58.3" to the bug ticket.A ticket may collect multiple such keywords.
When we publish a maintenance release, we create a tag from the maintenance branch. Example: http://bugs.icu-project.org/trac/log/tags/release-60-2